How Much Concrete Do I Need for Concrete Steps? Don't Count One Riser Per Step

Solid steps are not one riser high each — each step is a block one riser taller than the one before it. That is why steps need more concrete than most people guess. The formula Volume = tread × riser × n(n+1)/2 × width, all in feet, then ÷ 27 for cubic yards. Here n is the number of steps, and n(n+1)/2 is the triangular number. The common mistake is tread × riser × width × steps — for 5 steps that gives only one third of the concrete actually needed. A worked example: 5 steps, 11 in tread, 7 in riser, 4 ft wide Tread: 11 in = 0.917 ft Riser: 7 in = 0.583 ft Triangular number: 5 × 6 ÷ 2 = 15 Volume: 0.917 × 0.583 × 15 × 4 = 32.08 cubic feet Cubic yards: 32.08 ÷ 27 = 1.19 cubic yards With 10% waste: 1.31 cubic yards Bags: 54 × 80 lb bags, 59 with waste A comfortable step A comfortable step is a 7 in riser with an 11 in tread — keep every step identical, or people will trip. Waste and landings Add 10% waste for solid steps (15% if the ground is rough or the forms are old)...